2013 OASDI Trustees Report

 
The following table presents the plot points for Figure VI.E3 — the OASDI Cost Rates, on a calendar year basis over the long-range projection period (2013-2090), under each of the three alternative sets of assumptions and under the stochastic projection methodology. The column headings for the stochastic methodology represent the percent of the 5,000 simulations with values less than or equal to the cost rate shown in the table.
 
RETURN TO TRUSTEES REPORT.

SSA Home | Privacy Policy | Website Policies & Other Important Information | Site Map | Actuarial Publications May 31, 2013